Evaluating the impact of the construction of the New Assiut Barrage on the groundwater level
ABDELRAHEEM, M., Abd-Elmaseih, S., mohamed, K., Abdel-Rehim, G., Hossen, H. (2023). Evaluating the impact of the construction of the New Assiut Barrage on the groundwater level. EKB Journal Management System, 3(2), 148-163. doi: 10.21608/aujst.2023.242640.1066
MOHAMMED MOUSTAFA KHOUDARY ABDELRAHEEM; Shenouda Alkess Abd-Elmaseih; kamal abbas mohamed; Gamal Abozeid Abdel-Rehim; Hickmat Hossen. "Evaluating the impact of the construction of the New Assiut Barrage on the groundwater level". EKB Journal Management System, 3, 2, 2023, 148-163. doi: 10.21608/aujst.2023.242640.1066
ABDELRAHEEM, M., Abd-Elmaseih, S., mohamed, K., Abdel-Rehim, G., Hossen, H. (2023). 'Evaluating the impact of the construction of the New Assiut Barrage on the groundwater level', EKB Journal Management System, 3(2), pp. 148-163. doi: 10.21608/aujst.2023.242640.1066
ABDELRAHEEM, M., Abd-Elmaseih, S., mohamed, K., Abdel-Rehim, G., Hossen, H. Evaluating the impact of the construction of the New Assiut Barrage on the groundwater level. EKB Journal Management System, 2023; 3(2): 148-163. doi: 10.21608/aujst.2023.242640.1066