A HEURISTIC PROJECT SCHEDULING APPROACH | ||
| The International Conference on Applied Mechanics and Mechanical Engineering | ||
| Article 45, Volume 2, 1st Conference on Applied Mechanical Engineering., May 1984, Pages 89-104 PDF (3.07 M) | ||
| Document Type: Original Article | ||
| DOI: 10.21608/amme.1984.49922 | ||
| Authors | ||
| M. A. El Kadeem1; M. A. El Dardiry2; S. A. Moussad3 | ||
| 1Prof. and Head of Prod. Eng. Dept.,Alexandria University. | ||
| 2Assist. Prof., Prod. Eng. Dept., Alexandria University. | ||
| 3Assist. Lecturer, Prod. Eng. Dept., Alexandria University. | ||
| Abstract | ||
| This work documents a conventional heuristic project scheduling .approach for solving multiple resource-constrained project scheduling problems. Thus, the intent of this paper, is to demonstrate the design aspects of a suggested heuristic approach for resource leveling to projects scheduling under limited resource availabilities, The typical characteristics of the suggested heuristic procedure are: a- Resource leveling program utilizes the parallel approach. b- Multi-resource constrained with variable, resource availabilities. c- Make use of different priority rules d- Possibility of activity splitting Test problem results are represented | ||
|