ENERGY REQUIREMENTS FOR OPERATING THE ROTARY PLOW UNDER EGYPTION CONDITIONS | ||
Journal of Soil Sciences and Agricultural Engineering | ||
Article 4, Volume 1, Issue 5, May 2010, Pages 463-473 PDF (511.69 K) | ||
Document Type: Original Article | ||
DOI: 10.21608/jssae.2010.74865 | ||
Authors | ||
M. M. E. Abo-Habaga1; Kh. A. A. Khadr2; O. E. M. M. Naeem3 | ||
1Agric. Engineering Dept., Faculty of Agric. Mansoura University | ||
2Agric. Engineering Research Institute, ARC. | ||
3Ministry of Agriculture | ||
Abstract | ||
The experiments were carried out at the farm of El-Gimmaza Research Station, El-Gharbia Governorate , on clayey soil . The field study was conducted to determined the energy requirements for operating the rotary plow as primary and secondary tillage machin under Egyption conditions . The results indicated that , the energy requirement for operating the chisel plow the equivalent of 67% from the energy requirement rotary plow at the same operating speed and soil conditions .The rotary plow produce a suitable seedbed without a secondary tillage operation . Therefore , the use of rotary plow to prepare a suitable seedbed as secondary tillage need the energy equivalent to 82 % of the energy needed using the chisel plow for seedbed preparation. | ||
Statistics Article View: 209 PDF Download: 469 |