A Method of Theodolite Installation at the Intersection of Two Perpendicular Lines. | ||||
MEJ- Mansoura Engineering Journal | ||||
Article 3, Volume 32, Issue 4, December 2007, Page 20-26 PDF (163.02 K) | ||||
Document Type: Research Studies | ||||
DOI: 10.21608/bfemu.2020.128781 | ||||
View on SCiNiTO | ||||
Author | ||||
Zaki Mohamed Zeidan El-Sheikha* | ||||
Public Works Department, Faculty of Engineering El-Mansoura University, Egypt. | ||||
Abstract | ||||
The problem of theodolite installation at the intersection of two perpendicular lines is very important to set walls and columns in any structural building. In this paper there is a simple solution for laying out a point corresponding to the crossing of principle building axes. Besides to, the accuracy evaluation of this point is available. This is by carrying out two examples for evaluating the most probable position of this point by theodolite 2T30 and T5. | ||||
Keywords | ||||
Installation; intersection; coordinate reticulation | ||||