Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects
El-Samadony, A., Tantawy, M., Atta, M. (2020). Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects. EKB Journal Management System, 48(No 6), 1196-1221. doi: 10.21608/jesaun.2021.169075
Adel El-Samadony; Mohamed Tantawy; Mohamed M. Atta. "Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects". EKB Journal Management System, 48, No 6, 2020, 1196-1221. doi: 10.21608/jesaun.2021.169075
El-Samadony, A., Tantawy, M., Atta, M. (2020). 'Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects', EKB Journal Management System, 48(No 6), pp. 1196-1221. doi: 10.21608/jesaun.2021.169075
El-Samadony, A., Tantawy, M., Atta, M. Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects. EKB Journal Management System, 2020; 48(No 6): 1196-1221. doi: 10.21608/jesaun.2021.169075