CAUSES OF DELAY AND COST OVERRUN FOR EDUCATIONAL BUILDING PROJECTS IN EGYPT | ||||
JES. Journal of Engineering Sciences | ||||
Article 3, Volume 49, No 5, September and October 2021, Page 577-596 PDF (713.53 K) | ||||
Document Type: Research Paper | ||||
DOI: 10.21608/jesaun.2021.69258.1044 | ||||
View on SCiNiTO | ||||
Authors | ||||
Mohamed Gebrel 1; Kamal Abas Assaf2; Alaa Atef2; Moataz Awad3 | ||||
1Civil Engineering Department, Faculty of Engineering, Sohag University, Egypt | ||||
2Civil Engineering Department, Faculty of Engineering, Assuit University Assuit, Egypt | ||||
3Civil Engineering Department, Faculty of Engineering, Minia university, Minia, Egypt | ||||
Abstract | ||||
The construction industry is considered one of the most important industries in Egypt. The majority of construction projects are known to have time delays and cost overruns. The main contribution of this study is that it is the first study of its type that identifies causes of delay and cost overrun in educational building projects with its different types (public schools, private schools, public universities, and private universities) within Egypt. The research main objective is to identify the causes of delay and cost overrun in educational building projects in Egypt and evaluate their importance by the main project stakeholders (Consultants, Contractors, and Owners). This objective was accomplished by means of an extensive literature review and a questionnaire-based survey. Forty causes of delay and cost overrun were gathered through the literature review and categorized into seven groups. The questionnaire was divided into three sections; the main section concentrated on the causes of delay and cost overrun in construction projects. Responses were gathered from 130 participants representing the key stakeholders participated in the project's construction. The analysis was conducted to determine the amount of delay and cost overrun experienced by the projects, in addition to the indices concerning the frequency of occurrence, impact on time and cost, and significance of the seven groups. As well, a ranking of the forty causes was performed to identify the most critical causes of delay and cost overrun in each type of educational building projects (public schools, private schools, public universities, and private universities). | ||||
Keywords | ||||
Time Overrun; Cost Overrun; Educational Building Projects; Egypt; Relative Importance Index (RII) | ||||
References | ||||
[1]. Ezeldin, A. S., & Abdel-Ghany, M. (2013). Causes of construction delays for engineering projects: An Egyptian perspective. In AEI 2013: Building solutions for architectural engineering (pp. 54-63).
[2]. Abd El-Razek, M. E., Bassioni, H. A., & Mobarak, A. M. (2008). Causes of delay in building construction projects in Egypt. Journal of construction engineering and management, 134(11), 831-841.
[3]. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), 349-357.
[4]. Famiyeh, S., Amoatey, C. T., Adaku, E., & Agbenohevi, C. S. (2017). Major causes of construction time and cost overruns. Journal of Engineering, Design and Technology.
[5]. Samarghandi, H., Mousavi, S., Taabayan, P., Mir Hashemi, A., & Willoughby, K. (2016). Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran.
[6]. Kholif, W., Hosny, H., & Sanad, A. (2013). Analysis of time and cost overruns in educational building projects in Egypt. International Journal of Engineering and Technical Research, 1(10), 1-8.
[7]. Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of advanced research, 5(1), 49-55.
[8]. Tilahun, S. (2016). Cause and Effects of Delay on Educational Building Projects in Addis Ababa University Case Study.
[9]. Tawil, N. M., Khoiry, M. A., Arshad, I., Hamzah, N., Jasri, M. F., & Badaruzzaman, W. H. W. (2013). Factors contribute to delay project construction in higher learning education case study UKM. Research Journal of Applied Sciences, Engineering and Technology, 5(11), 3112-3116.
[10]. Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371-381.
[11]. Susanti, R. (2020, January). Cost overrun and time delay of construction project in Indonesia. In Journal of Physics: Conference Series (Vol. 1444, No. 1, p. 012050). IOP Publishing.
[12]. Prasad, K. V., Vasugi, V., Venkatesan, R., & Bhat, N. S. (2019). Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), 216-238.
[13]. Johnson, R. M., & Babu, R. I. I. (2020). Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management, 20(5), 402-411.
[14]. Ahmad, S. A., Issa, U. H., Farag, M. A., & Abdelhafez, L. M. (2013). Evaluation of risk factors affecting time and cost of construction projects in Yemen. International journal of management, 4(5), 168-178. Vince A, Pine WJ, Lum P. The Bailey method—achieving volumetric and HMA compatibility. Course Materials and Handouts (2009) | ||||
Statistics Article View: 858 PDF Download: 951 |
||||