Surveying the seepage area in Dong Do dam by the improved multi-electrode electrical exploration method | ||||
Frontiers in Scientific Research and Technology | ||||
Article 8, Volume 3, Issue 1, 2022, Page 70-77 PDF (1.41 MB) | ||||
Document Type: Original Article | ||||
DOI: 10.21608/fsrt.2021.112247.1053 | ||||
![]() | ||||
Authors | ||||
Chung Anh Do1; Minh Duc Vu ![]() ![]() | ||||
1Vietnam Academy for Water Resources, Hanoi, Viet Nam, 171 Tay Son, Dong Da, Hanoi, Vietnam. | ||||
2VNU University of Science | ||||
3Geology Department, Faculty of Science, Suez University, Suez, 43518, Egypt | ||||
Abstract | ||||
One of the common dangers of earth dams is seepage, or leakage through either the dam body, the dam foundation, or the culverts. This article introduces results of utilizing the improved multi-electrode electrical exploration method to survey the seepage area in the Dong Do dam in Minh Tan village, Minh Tri commune, Soc Son district, Hanoi, Vietnam. The results show two possible seepage anomalies in the survey profile along the heartbeat line, one seepage anomaly in the survey profile at the center of roof 1, one seepage anomaly in the survey profile at the center of roof 2 and a large heterogenous area in the first profile from the 185th meter position to the flood spillway staring from the surface down to a depth of 11m that the previous drilling could not reach these areas. These results confirm the effectiveness of the improved multi-electrode electrical exploration method in investigating hidden hazards in general, and the seepage areas in the dam in particular. | ||||
Keywords | ||||
Seepage area; dam; improved multi-electrode electrical exploration; profile | ||||
Statistics Article View: 223 PDF Download: 187 |
||||