IRT-1 Research Reactor Decommissioning Preliminary Plan | ||||
Arab Journal of Nuclear Sciences and Applications | ||||
Article 18, Volume 56, Issue 2, January 2023, Page 122-126 PDF (722.38 K) | ||||
Document Type: Original Article | ||||
DOI: 10.21608/ajnsa.2023.172311.1667 | ||||
View on SCiNiTO | ||||
Author | ||||
usamah Amara bennail | ||||
TRIPOLI-LIBYA | ||||
Abstract | ||||
The 10th African Conference on Research Reactor Safety, Operation & Utilization IRT-1 Research Reactor Decommissioning: Preliminary Plan Eng, Usamah Amara Ben Nail1, Eng. Fathi Mohamed Haj2 Tajora Nuclear Research Center Osa_om_74@yahoo.com1, Fathi_abduo@yahoo.com2 Abstract: The Tajora Nuclear Research center (TNRC) has two reactors, one of them with a power of 10 MWth and the other Critical Facility Stand with a power of 100 within operation for 41 years, the status of the research reactor is extended shutdown since 2013, for these reasons, the decommissioning plan it became important. The preliminary decommissioning plan consists of actions and steps required as well as the strategies to be adopted for the shutdown of the facility under the technical and administrative, seeking the safety, of health workers and the general public, and minimizing environmental impacts. This work aims to develop a preliminary plan for decommissioning the research reactor, considering the technical documentation of the system (SAR-Safety Analysis Report), the existing rules of the Libyan Atomic Energy Establishment, as well as regulatory instructions and recommendations of the IAEA. | ||||
Keywords | ||||
TNRC; Protection; Radiation | ||||