Impact of Flow in Pipe and Box Coverages on Open Channel’s Performance | ||||
JES. Journal of Engineering Sciences | ||||
Article 2, Volume 51, Issue 3, May and June 2023, Page 173-188 PDF (1.27 MB) | ||||
Document Type: Research Paper | ||||
DOI: 10.21608/jesaun.2023.192038.1206 | ||||
View on SCiNiTO | ||||
Author | ||||
emam anter osman | ||||
street of police station | ||||
Abstract | ||||
This experimental study aims to characterize the behavior of pipe and box coverages concerning their size, form, and upstream blockage ratio. In an artificial trapezoidal cross-section, five experimental cases were carried out: Case 1 involved an artificial canal without coverage or blockage; Cases 2 and 3 concerned pipe coverages with circular cross-sections (Pipe 1 and 2); Cases 4 and 5 involved box coverages with square cross-sections (Box 1 and 2). While the area of pipe 1 and box 1 are equal, the area of pipe 2 and box 2 is the same and greater than the area of pipe 1 and box 1. Three blockage ratios and three water flow rates were used in the experimental study. Each case included an investigation of the hydraulic performance of the open channel and the scouring pattern downstream of the coverage. In comparison to the case when there was no coverage present at the same condition, the presence of coverage in the open channel and the significant increase in flow rate, blocking ratio, and decreasing inlet area of coverage increased the heading up, head losses, scour depth, and scour length. In the same area and condition, the pipe coverage achieves greater scour depth and length than the box coverage. The box coverage is better for the open channels' performance than the pipe coverage. The research recommended using the box coverage rather than the pipe coverage and checking the maintenance processes to avoid the negative effect on the open channels' performance. | ||||
Keywords | ||||
Pipe coverage, Box coverage; Open Channel; Blockage ratio; Scour | ||||
References | ||||
[1] Soleyman Emami, Anton J. Schleiss , ‘Prediction of Localized Scour Hole on Natural Mobile Bed at Culvert Outlet”, Conference Paper in Geotechnical Special Publication -October 2010.
[2] M. Gunal, A. Y. Gunal, K.Osman, “Simulation of blockage effects on scouring downstream of box culverts under unsteady flow conditions”, International Journal of Science and Technology (2019), 16:5305-5310.
[3] Emam A. Osman, Zahraa Taha,“ Impact of box section coverage on the hydraulic parameters of open channels”, Water Practice & Technology Journal, Vol 17 No 1, 26 doi: 10.2166/wpt.2021.103.
[4] Ebrahim A. El Hafez, “ Study of Scour Downstream Different Shapes of Culverts”, Tekreet Journal of Engineering Science, 2011, Volume 18, No 2, Page 44-54.
[5] Miranzadeh Azam, Keshavarzi Alireza & Hamidifar Hossein, “Blockage of box-shaped and circular culverts under flood conditions: a laboratory investigation”, International Journal of River Basin Management, April 2022.
[6] M. Kramer, W.L. Peirson, R. French, and G.P. Smith, “A physical model study of culvert blockage by large urban debris”, Australian Journal of Water Resources, 2016, DOI: 10.1080/13241583.2015.1116184.
[7] M. r. Fahmy, “Maximum scour depth and length downstream of tail escape”, Water Utility Journal 13: 57-68, 2016.
[8] Abdel Aal. G.M. , Elsaiad. A. A, Elnikhely.E. A , and Zaki. E. M., "Reducing the Local Scour Depth at the Culvert Outlets", International Journal of Engineering Science and Computing, May 2019, Volume 9 Issue No.5.
[9] Sorourian S, Keshavarzi A, and Ball J. scour at partially blocked box-culverts under steady flow. Institution of Civil Engineering, 2015, Vol. 169, issue WM6.
[10] Zahraa T. Shahat, Ashraf S. Ellean, Hossam M. Sief, Mohammed F. Sobeih, "Assessment the impact of covering a part of a watercourse by pipe", Australian Journal of Basic and Applied Sciences, 2018 December; 12(12): pages 113-120, DOI: 10.22587/ajbas.2018.12.12.19.
[11] Negm, A.M, Nassar, M.A , and Elnikhely EA. Minimization of Scour and Deposition Downstream Pipe with a Limited Floor Protection, International Water Technology Journal (IWTJ); Vol. 4, No. 3, September 2014.
[12] Tawab E.Aly. "Improving The Pipe Culvert Efficiency By Using Inclined Headwalls", International Water Technology Journal (IWTJ), Vol. 7–No.1, March 2017.
[13] E.H. Rigby, M.J. Boyd, S. Roso, P. Silveri, and A. Davis, "Causes and Effects of Culvert Blockage During Large Storms", 9th International Conference on Urban Drainage, Oregon, USA, 8-13 September 2002.
[14] Zahiraniza Mustaffa, Natasha Madzlan, and Ayesha Ghulam Rasool, "Dealing with Supercritical Flow in Culvert". ICESD 2013: January 19-20, Dubai, UAE, APCBEE Procedia 5 ( 2013 ) 306 – 311.
[15] S. Karimpour, and S. Gohari, " An Experimental Study on the effects of Debris Accumulation at the Culvert Inlet on Downstream Scour", Journal of Rehabilitation in Civil Engineering 8-2 (2020) 184-199. | ||||
Statistics Article View: 146 PDF Download: 470 |
||||