Technical Requirements of Connecting Wind Farms to the Egyptian Grid Based on the Wind Farm Grid Connection Code
عبد الله, . (2023). Technical Requirements of Connecting Wind Farms to the Egyptian Grid Based on the Wind Farm Grid Connection Code. EKB Journal Management System, 62(1), 35-16.
عمر حنفى عبد الله. "Technical Requirements of Connecting Wind Farms to the Egyptian Grid Based on the Wind Farm Grid Connection Code". EKB Journal Management System, 62, 1, 2023, 35-16.
عبد الله, . (2023). 'Technical Requirements of Connecting Wind Farms to the Egyptian Grid Based on the Wind Farm Grid Connection Code', EKB Journal Management System, 62(1), pp. 35-16.
عبد الله, . Technical Requirements of Connecting Wind Farms to the Egyptian Grid Based on the Wind Farm Grid Connection Code. EKB Journal Management System, 2023; 62(1): 35-16.