Productivity Improvement by Using Time and Motion Study Techniques in Lotus High Tech Company | ||||
ERJ. Engineering Research Journal | ||||
Article 9, Volume 36, Issue 2, December 2013, Page 175-181 PDF (846.03 K) | ||||
Document Type: Original Article | ||||
DOI: 10.21608/erjm.2013.67067 | ||||
![]() | ||||
Authors | ||||
H. H. Abdel-Maksoud1; A. El-Nikhaily1; R. I. Elsoeudy2; A. Z. Khafagy3 | ||||
1Mechanical Department, Faculty of Industrial Education, Suez University, Suez, Egypt | ||||
2Production Engineering Department, Faculty of Engineering, Suez Canal University, Ismailia, Egypt | ||||
3Production Engineering Department, Faculty of Engineering, Port Said University, Port Said, Egypt | ||||
Abstract | ||||
The purpose of this research is to improve productivity in Lotus High Tech Company (LHTC). This research used time and motion study techniques to improve the production process at LHTC. The research objectives towards accomplishing this study is to identify problems in the current method and improve it in terms of production time, number of process and production layout by proposing a new method to the manufacturing product. The current method in the manufacturing of garment in the production line involved some unnecessary steps, where the materials and components take a very long and roundabout path on their journey to the workstation, which adversely affect productivity. The proposed method eliminates these steps, which reduces production time, number of processes, and the overall increase in productivity is about 72.6%. | ||||
Keywords | ||||
Time and Motion Study; Method Improvement; Production Processes; Flow Charts; Flow Process Analysis; productivity | ||||
Statistics Article View: 385 PDF Download: 389 |
||||