NEW APPROACH FOR REDESIGNING THE INGASSANA CHROMITE MINE IN SUDAN | ||||
ERJ. Engineering Research Journal | ||||
Article 6, Volume 32, Issue 2, April 2009, Page 169-171 PDF (371.79 K) | ||||
Document Type: Original Article | ||||
DOI: 10.21608/erjm.2009.69402 | ||||
View on SCiNiTO | ||||
Author | ||||
Mostafa Ahmed Ismail | ||||
Faculty of Petroleum and Mining Engineering, Suez Canal University | ||||
Abstract | ||||
The present article deals with the use of a computer program which has been used to design the methods of minerals extraction. The work was carried out on the chromite deposits at Ingassana in Sudan, in order to improve the working, i.e. increasing the extraction ratio of the ore and increasing the safety at the stopping areas. The (ARMPS) computer program which being universally used to design metallic and non-metallic ores mining methods, was applied on the Sudanese chromite ores at Ingassana. Using this program the stope and pillar mining method which its pillars are irregularly shaped and sized and either randomly located or located in low grade ore, was changed to room and pillar method having sequre cross sectional pillars (sized and shaped) instead of rectangular cross section pillars. An increase in the extraction ratio of 12% was achieved at a safe factor of 1.6 which is usually adopted in the extraction of mineral ores and coal. | ||||
Statistics Article View: 77 PDF Download: 124 |
||||