ENERGY REQUIREMENTS FOR OPERATING THE ROTARY PLOW UNDER EGYPTION CONDITIONS | ||||
Journal of Soil Sciences and Agricultural Engineering | ||||
Article 4, Volume 1, Issue 5, May 2010, Page 463-473 PDF (511.69 K) | ||||
Document Type: Original Article | ||||
DOI: 10.21608/jssae.2010.74865 | ||||
View on SCiNiTO | ||||
Authors | ||||
M. M. E. Abo-Habaga1; Kh. A. A. Khadr2; O. E. M. M. Naeem3 | ||||
1Agric. Engineering Dept., Faculty of Agric. Mansoura University | ||||
2Agric. Engineering Research Institute, ARC. | ||||
3Ministry of Agriculture | ||||
Abstract | ||||
The experiments were carried out at the farm of El-Gimmaza Research Station, El-Gharbia Governorate , on clayey soil . The field study was conducted to determined the energy requirements for operating the rotary plow as primary and secondary tillage machin under Egyption conditions . The results indicated that , the energy requirement for operating the chisel plow the equivalent of 67% from the energy requirement rotary plow at the same operating speed and soil conditions .The rotary plow produce a suitable seedbed without a secondary tillage operation . Therefore , the use of rotary plow to prepare a suitable seedbed as secondary tillage need the energy equivalent to 82 % of the energy needed using the chisel plow for seedbed preparation. | ||||
Statistics Article View: 97 PDF Download: 322 |
||||