EKB Journal Management System
Author = Nashat A. Ali
Number of Articles: 6

1

SIMPLIFICATION OF WATER SUPPLY SYSTEMS FOR PRODUCING MORE OPTIMAL PUMP SCHEDULES IN LESS TIMES

Volume 44, No 4, July and August 2016, Page 351-362
Nashat A. Ali; Gamal Abozeid; Moustafa S. Darweesh; Mohamed Mamdouh

2

EVALUATION OF REHABILITATION SOLUTIONS FOR PERFORMANCE OF WATER PIPES NETWORK (CASE STUDY-EL- MINIA NEW CITY NETWORK)

Volume 43, No 5, September and October 2015, Page 644-662
Nashat A. Ali; Gamal Abozeid; Moustafa S. Darweesh; Mohamed Mamdouh

3

ANALYSIS OF DIFFERENT PROTECTION METHODS AGAINST WATER HAMMER ON WATER SUPPLY NETWORK (CASE STUDY-ASSIUT CITY NETWORK)

Volume 41, No 6, November and December 2013, Page 2021-2035
Nashat A. Ali; Gamal Abozeid; Moustafa S. Darweesh

4

STUDYING OF WATER HAMMER IN WATER SUPPLY PIPES NETWORK WITH DIFFERENT ABNORMAL OPERATION CONDITIONS (CASE STUDY - ASSIUT CITY NETWORK)

Volume 41, No 6, November and December 2013, Page 2036-2054
Nashat A. Ali; Gamal Abozeid; Moustafa S. Darweesh

5

ANALYSIS OF SOME PARAMETERS AFFECTING THE CHARACTERISTICS OF POLLUTED WATER – JET IN OPEN CHANNEL

Volume 40, No 1, January and February 2012, Page 109-120
Nashat A. Ali; Gamal Abozeid; Mohammed G. Elshamandy

6

HYDRAULICS OF SURFACE POLLUTED WATER - JET IN OPEN CHANNEL FLOW

Volume 38, No 1, January and February 2010, Page 71-84
Nashat A. Ali; Gamal Abozeid; Ali A. Mohamed; Moustafa S. Darweesh