ALLOCATION AND REDUCTION OF RISK REQUIRED CAPITAL AFTER COMBINING OF THE UNITS
El-Said, D. (2007). ALLOCATION AND REDUCTION OF RISK REQUIRED CAPITAL AFTER COMBINING OF THE UNITS. EKB Journal Management System, 1(1), 253-268. doi: 10.21608/sjcs.2007.223739
Dr. Mahmoud Farouk El-Said. "ALLOCATION AND REDUCTION OF RISK REQUIRED CAPITAL AFTER COMBINING OF THE UNITS". EKB Journal Management System, 1, 1, 2007, 253-268. doi: 10.21608/sjcs.2007.223739
El-Said, D. (2007). 'ALLOCATION AND REDUCTION OF RISK REQUIRED CAPITAL AFTER COMBINING OF THE UNITS', EKB Journal Management System, 1(1), pp. 253-268. doi: 10.21608/sjcs.2007.223739
El-Said, D. ALLOCATION AND REDUCTION OF RISK REQUIRED CAPITAL AFTER COMBINING OF THE UNITS. EKB Journal Management System, 2007; 1(1): 253-268. doi: 10.21608/sjcs.2007.223739