INTRODUCING HEURISTIC METHODS TO SOLVE SCHEDULING OF MULTISTAGE FLOWSHOP WITH IDENTICAL PARALLEL MACHINES
EL-LALTHY, H., ISMAIL, M., BAHI, S. (1984). INTRODUCING HEURISTIC METHODS TO SOLVE SCHEDULING OF MULTISTAGE FLOWSHOP WITH IDENTICAL PARALLEL MACHINES. EKB Journal Management System, 2(1st Conference on Applied Mechanical Engineering.), 141-152. doi: 10.21608/amme.1984.49717
HASSAN EL-LALTHY; MOHAMED ISMAIL; SHERIF BAHI. "INTRODUCING HEURISTIC METHODS TO SOLVE SCHEDULING OF MULTISTAGE FLOWSHOP WITH IDENTICAL PARALLEL MACHINES". EKB Journal Management System, 2, 1st Conference on Applied Mechanical Engineering., 1984, 141-152. doi: 10.21608/amme.1984.49717
EL-LALTHY, H., ISMAIL, M., BAHI, S. (1984). 'INTRODUCING HEURISTIC METHODS TO SOLVE SCHEDULING OF MULTISTAGE FLOWSHOP WITH IDENTICAL PARALLEL MACHINES', EKB Journal Management System, 2(1st Conference on Applied Mechanical Engineering.), pp. 141-152. doi: 10.21608/amme.1984.49717
EL-LALTHY, H., ISMAIL, M., BAHI, S. INTRODUCING HEURISTIC METHODS TO SOLVE SCHEDULING OF MULTISTAGE FLOWSHOP WITH IDENTICAL PARALLEL MACHINES. EKB Journal Management System, 1984; 2(1st Conference on Applied Mechanical Engineering.): 141-152. doi: 10.21608/amme.1984.49717