Number of Articles: 2 | ||
1 | INTRODUCING HEURISTIC METHODS TO SOLVE SCHEDULING OF MULTISTAGE FLOWSHOP WITH IDENTICAL PARALLEL MACHINES | |
Volume 2, 1st Conference on Applied Mechanical Engineering., May 1984, Page 141-152 | ||
HASSAN EL-LALTHY; MOHAMED ISMAIL; SHERIF BAHI | ||
2 | WORK HARDENING IN TURNING OF AL-10%WT CU ALLOY PRODUCED BY RHEOCASTING | |
Volume 2, 1st Conference on Applied Mechanical Engineering., May 1984, Page 163-172 | ||
SHERIF BAHI; NABIL FAT-HALLA; NAHED A. EL-MAHALLAWY; MOHAMED A. TAHA | ||