Number of Articles: 5 | ||
1 | FACTORS AFFECTING THE CONSTRUCTION PROJECTS FINANC COST | |
Volume 16, EIJEST, Vol. 16, 2013, June 2016, Page 69-77 | ||
H Mohamed; A Ibrahim | ||
2 | MODELING EXCAVATION OPERATION IN BUILDING PROJECT SIMULATION APPROACH | |
Volume 15, EIJEST, Vol. 15, 2012, June 2012, Page 46-54 | ||
E Elbeltagi; H Mohamed; D Thabet | ||
3 | NEURAL NETWORK AND MULTIPLE REGRESSION MODELS FO ESTIMATION OF PRODUCTION RATES IN EXCAVATION OPERATIONS | |
Volume 15, EIJEST, Vol. 15, 2012, June 2012, Page 1-11 | ||
E Elbeltagi; H Mohamed; D Thabet | ||
4 | المنشآت الديناميکية المتحولة متطلبات ومراحل إعداد العملية التصميمية | |
Volume 15, EIJEST, Vol. 15, 2012, June 2012, Page 120-128 | ||
S Desoky; K Nabil; H Mohamed | ||
5 | ASSESSMENT OF CONSTRUCTION MATERIALS WASTAGE USIN ARTIFICIAL NEURAL NETWORK MODEL | |
Volume 15, EIJEST, Vol. 15, 2012, June 2012, Page 180-188 | ||
E Elkassas; H Mohamed; K Khawasik | ||